DEMOLITION
SPECIALIST, INC.
HomeAbout
Services
GPR ScanningFlat SawingWall SawingCore DrillingAsphalt GrindingBreaking & HaulingBuilding Tear-DownsSite DemolitionSuper 10'sCompressor & TorchingLabor
Request Estimate(951) 737-2077
Home / Services / Labor

Demolition Labor Crews

Trained demolition laborers for strip-out, debris loading, boom lift operation, and site cleanup — on your schedule and under your GC.

Aerial view of DSI Demolition Specialist service truck parked with boom lift and crew working at elevation on commercial building
DSI worker on ladder actively dismantling wall framing and insulation during interior demolition

What We Do

DSI provides trained demolition labor for stripping, loading, cleanup, and manual removal tasks on active construction and demolition sites. Our laborers understand site safety, work within GC protocols, and keep pace with the surrounding trades without creating supervision overhead for the project manager.

Available as part of a full demolition scope or as standalone crews for a specific phase of work.

When You Need Demolition Labor

Machines do the heavy breaking, but a lot of demolition is still hand work: stripping finishes, cutting out framing and drywall, loading debris, cleaning up after other trades and keeping the site safe and passable. DSI's labor crews cover that work so your own staff and trades stay on their scopes.

  • Interior strip-out for tenant improvements and remodels: ceilings, partitions, flooring and fixtures
  • Debris loading into roll-off bins and Super 10 trucks
  • Elevated work from boom lifts, such as removing ceiling systems, ductwork and fixtures
  • Site cleanup between phases and before inspections
  • Support for compressor crews, saw cutters and equipment operators

How DSI Labor Crews Work

  1. Confirm the scope, crew size, start date and site rules with the superintendent.
  2. Review the asbestos survey and abatement clearance, utility shut-offs and any areas to protect.
  3. Work to the GC's schedule and safety program, with a DSI lead on site.
  4. Separate metals and concrete for recycling and keep the debris path clear.
  5. Leave each area clean at the end of every shift, with daily reports when the job is time-and-material.

What Affects the Cost of Demolition Labor

Labor is quoted by the day or hour, or as part of a fixed-price demolition scope. The main factors are:

  • Crew size and how many days or shifts
  • Night, weekend or phased work around building occupants
  • Prevailing wage on public works projects
  • Whether bins, trucks and equipment are included
  • Lifts, protection and dust control the work requires

See fixed-price or time-and-material for how we bill.

Safety & Compliance

DSI laborers work under our Cal/OSHA safety program and the GC's site rules, with the PPE, fall protection and lift training the task requires. Nobody starts stripping finishes before the asbestos survey and any abatement are complete, and silica-generating work is done with water or vacuum controls.

For more on planning a strip-out, read our guide to selective and interior demolition.

Service Area

DSI provides demolition labor from our Riverside yard across the Inland Empire, including Corona, Ontario, San Bernardino, Fontana, Rancho Cucamonga, Moreno Valley, Temecula, Jurupa Valley, and on larger projects in Southern California, the High Desert, Palm Springs and the Coachella Valley, the Central Valley, Northern California. See all California service areas.

Call (951) 737-2077 or send your scope for an estimate; we respond within one business day.

Common Questions
Can I hire DSI labor without the rest of the demo scope?
Yes. DSI provides standalone labor crews for strip-out, debris loading, site cleanup, and elevated work — no full demo scope required.
Are your laborers experienced on active job sites?
Yes. DSI laborers work within GC protocols and active construction site safety requirements. They don't need supervision overhead from your project manager.
Can your labor crew operate boom lifts?
Yes. Boom lift and aerial platform operation are within DSI labor scope for elevated surface and rooftop work.
Do you bill labor hourly or fixed price?
Both. T&M day rates or fixed-price contracts depending on what the scope calls for. Confirm when you call for a quote.
How many laborers can you send?
Crew size is set to the scope and schedule, from a small crew for cleanup to larger crews for phased strip-out. Tell us the work and the timeline and we will staff it.
Do your laborers work under our superintendent?
Yes. Our crews follow the GC's schedule, site rules and safety program, with a DSI lead coordinating directly with your superintendent.
Can you provide labor on prevailing wage jobs?
Yes. DSI is DIR-registered (#1000002162) and handles certified payroll for public works projects.
DSI laborer in full PPE sweeping demolition debris on concrete floor of stripped commercial building
Capabilities
Trained demolition laborers with active job-site experience
Boom lift and aerial platform operation
Interior strip-out, wall framing, and debris loading
Rooftop and elevated surface work
Available on T&M or fixed-price contract
Coordinated under DSI foreman or GC supervision

Need Demo Labor?

Call or submit your scope — we respond within one business day.